Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Şentürk, H A and Yazici, G (2004) Case Study: Izmit Domestic and Industrial Water Supply Build–Operate–Transfer Project. Journal of Construction Engineering and Management, 130(03), 449–54.

Abudayyeh, O, Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of Trends in Construction Research: 1985–2002. Journal of Construction Engineering and Management, 130(03), 433–9.

Bossink, B A G (2004) Managing Drivers of Innovation in Construction Networks. Journal of Construction Engineering and Management, 130(03), 337–45.

Christini, G, Fetsko, M and Hendrickson, C (2004) Environmental Management Systems and ISO 14001 Certification for Construction Firms. Journal of Construction Engineering and Management, 130(03), 330–6.

Fang, D P, Huang, X Y and Hinze, J (2004) Benchmarking Studies on Construction Safety Management in China. Journal of Construction Engineering and Management, 130(03), 424–32.

Gransberg, D D, Karaca, I and Senadheera, S (2004) Calculating Roller Requirements for Chip Seal Projects. Journal of Construction Engineering and Management, 130(03), 378–84.

Han, S H, Diekmann, J E, Lee, Y and Ock, J H (2004) Multicriteria Financial Portfolio Risk Management for International Projects. Journal of Construction Engineering and Management, 130(03), 346–56.

Moussourakis, J and Haksever, C (2004) Flexible Model for Time/Cost Tradeoff Problem. Journal of Construction Engineering and Management, 130(03), 307–14.

  • Type: Journal Article
  • Keywords: Project management; Construction management; Critical path method; Models; Time factors; Costs; Computer programming; project management; cost-benefit analysis; timing; construction industry; modelling; civil engineering;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:3(307)
  • Abstract:
    This paper presents a flexible mixed integer-programming model for the solution of the time/cost tradeoff problem encountered in project management. Whereas it is commonly assumed that the time/cost function is linear, the model presented in this paper makes minimal assumptions and accommodates any type of cost function that is linear, piecewise linear or discrete. The model can be used for answering various “what if” questions that may be very helpful to a project manager in making rational decisions. The basic model minimizes the total cost which is the sum of direct and indirect costs, subject to a project deadline constraint. A simple modification in the model changes the focus from minimizing total cost to minimizing project completion time subject to a resource constraint. The models of this paper can be set up and run very easily on commercially available optimization packages with an integer-programming module. These models provide a viable alternative to more specialized algorithms developed for the time/cost tradeoff problem simply because a typical project manager may not have the necessary skills or resources to implement specialized algorithms.

Nima, M A, Abdul-Kadir, M R, Jaafar, M S and Alghulami, R G (2004) Constructability Concepts in Kuala Selangor Cable-Stayed Bridge in Malaysia. Journal of Construction Engineering and Management, 130(03), 315–21.

O’Connor, J T and Yang, L (2004) Project Performance versus Use of Technologies at Project and Phase Levels. Journal of Construction Engineering and Management, 130(03), 322–9.

Peng, J (2004) Structural Modeling and Design Considerations for Double-Layer Shoring Systems. Journal of Construction Engineering and Management, 130(03), 368–77.

Pietroforte, R and Stefani, T P (2004) ASCE Journal of Construction Engineering and Management: Review of the Years 1983–2000. Journal of Construction Engineering and Management, 130(03), 440–8.

Seo, S, Aramaki, T, Hwang, Y and Hanaki, K (2004) Fuzzy Decision-Making Tool for Environmental Sustainable Buildings. Journal of Construction Engineering and Management, 130(03), 415–23.

Shen, L Y, Li, Q M, Drew, D and Shen, Q P (2004) Awarding Construction Contracts on Multicriteria Basis in China. Journal of Construction Engineering and Management, 130(03), 385–93.

Wang, W (2004) Electronic-Based Procedure for Managing Unbalanced Bids. Journal of Construction Engineering and Management, 130(03), 455–60.

Warszawski, A and Sacks, R (2004) Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects. Journal of Construction Engineering and Management, 130(03), 357–67.

Zayed, T M and Halpin, D W (2004) Quantitative Assessment for Piles Productivity Factors. Journal of Construction Engineering and Management, 130(03), 405–14.

Zayed, T M and Halpin, D W (2004) Simulation as a Tool for Pile Productivity Assessment. Journal of Construction Engineering and Management, 130(03), 394–404.